A municipal emergency command center relies on a diesel backup generator with a 450-gallon fuel tank. Under a 75% operational electrical load, the generator consumes 18.5 gallons of diesel fuel per hour. If the tank is currently filled to 80% capacity and an emergency power outage occurs, for how many hours can the generator run before the fuel is completely exhausted?